Configure Anovis Test System

Design Your Customized System
2

System Configuration Made Easy

How would you like to start?

Configure the Anovis Test System

Design Your Customized System
Blank System

Start with a blank slate and configure your system entirely according to your individual requirements.

Configure the ANOVIS Test System

Design Your Customized System
Step 3 of 8
3

Automatically find the right system for your testing projects

First, we'll determine how many enclosures (SRDs) you need.

Configure the Anovis Test System

Design Your Customized System
How many parts or test cells would you like to test simultaneously?
The number of parts (test cells) is determined by the number of test stations. Example: When performing measurements with two test stations (2 test cells), you can either test two test specimens in a single station or in two separate stations (synchronously or alternately).
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20
Do you want to accommodate 2 nests in each housing?
We recommend placing a maximum of two nests on one SRD. If you need more than two test nests, it makes sense to use multiple SRDs.
Possible with a maximum cable length of 15 m to the sensor and when connected to the PLC via TCP/IP or UDP.
Yes
No
OK!
You need at least A Housing. B A housing forms C from

Configure the ANOVIS Test System

Design Your Customized System
4
4

Automatically find the right system for your testing projects

Now let's determine which cards will be installed in the cases.

Configure the Anovis Test System

Design Your Customized System
How many tachometers do you need per nest?
Speed data is essential for fault analysis on the component. Therefore, we recommend at least one speed data point for each test point.
via transducers per nest
Please enter a value between 1 and 21.
via another analog sensor per Nest
01 02 03 04
How many measurement channels do you need per nest?
We can determine the speed information programmatically by analyzing appropriate sensor data. Prerequisite: an analog sensor with an output signal of ±10 volts. Example: current or magnetic coil—counting the current ripples plus information about the design of the motor through which the current flows = speed
Estimate the total number of measurement channels required for your test applications—such as acceleration, force, strain, and others—as well as any backup channels.
Please enter a value between 1 and 44.
OK!
Your needs can be met using an Anovis A enclosure.

Configure the ANOVIS Test System

Design Your Customized System
5
5

Automatically find the right system for your testing projects

Now you decide on the specific channel assignments.

Configure the Anovis Test System

Design Your Customized System
Required devices (SRDs): 5 SRDs, each with 2 nests
Each device is equipped as follows

If there is an odd number of nests and multiple SRDs are operating in a two-nest configuration, variations in channel allocation are possible. These result from the potentially lower channel requirements in the last SRD. 

After discussing the test task
with you in person, we will be happy to recommend suitable sensor models.

Specifically, how many input channels do you need per physical quantity?
Your configuration can support up to 44 measurement channels per nest. 44 out of 44 measurement channels have been assigned.
Acceleration
Please enter a value between 1 and 44.
Force
Please enter a value between 1 and 44.
Suspense
Please enter a value between 1 and 44.
Other
Please enter a value between 1 and 44.

Configure Anovis Test System

Design Your Customized System
Step 6 of 8
6

Great! Now for the data acquisition software

Which software functionalities do you require?

Configure the Anovis Test System

Design Your Customized System
Which software functions do you require?
Multiple selection possible
The system should communicate with a PLC
Display historical data in addition to live data
Custom-designed user interface
Test specifications should be configurable from a separate workstation (e.g., in the office). This also allows test specifications to be configured without interrupting production.
In how many other locations (besides the test bench) should data be displayed graphically?
Please specify the number
01 02 03 04 05 06 07 08 09 10
Would you like regular updates and the ability to flexibly adapt the software's functionality to your current needs?
Yes
No
For how many years will your system be operated?
Number of years
01 02 03 04 05 06 07 08 09 10
What cable length do you need between the test port and the SRD?
In meters
01 02 03 04 05 06 07 08 09 10

Configure Anovis Test System

Design Your Customized System
Step 7 of 8
7

System Configuration Made Easy

Services

Configure the Anovis Test System

Design Your Customized System

Configure the ANOVIS Test System

Design Your Customized System
8

Review and Submit Configuration

Thank you for your time – please review your configuration carefully once more and submit it when everything is correct. 

Unsure? Don't worry. Afterwards, we will also review your configuration, leveraging our expertise as experienced measurement service providers. This service is free of charge for you. 

Your Selection
Configuration Hardware
Your Selection
Configuration Software Requirements
The Function Your System Supports
Selected Function & Extras

                Configure the ANOVIS Test System

                Design Your Customized System
                8

                Great! Your configuration is now complete.
                9
                How may we contact you?

                We'll review your configuration free of charge and with no obligation. Please provide your
                contact information so we can reach you if we have any questions.

                Do you need assistance?

                Your Questions – Our Expertise: Contact us now!